Mango waste based power generation at Chittoor in Andhra Pradesh, India
[]
Host party(ies) India
Methodology(ies) AMS-III.E. ver. 16
AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 50,818
Start date of first crediting period. 30 Mar 13
Length of first crediting period. 10 years
DOE/AE KBS Certification Services Limited
Period for comments 30 Dec 12 - 28 Jan 13
PP(s) for which DOE have a contractual obligation Marsun Power Private Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1318 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs