Installation of Top-Pressure Recovery Turbine at Blast Furnace -3
[]
Host party(ies) India
Methodology(ies) ACM0012 ver. 3
Standardised Baselines N/A
Estimated annual reductions* 56,221
Start date of first crediting period. 01 Jan 11
Length of first crediting period. 10 years
DOE/AE DNV-CUK
Period for comments 19 Nov 10 - 18 Dec 10
PP(s) for which DOE have a contractual obligation JSW Steel Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (439 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Comment (30 KB) Submitted by:


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs