12.6 MW MSW based power generation project at Nalgonda by HSPPL
[]
Host party(ies) India
Methodology(ies) AM0025 ver. 11
Standardised Baselines N/A
Estimated annual reductions* 257,858
Start date of first crediting period. 01 Apr 11
Length of first crediting period. 10 years
DOE/AE LRQA Ltd
Period for comments 03 Jun 10 - 02 Jul 10
PP(s) for which DOE have a contractual obligation Hema Sri Power Projects Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1552 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs