Sichuan Kangding Sandaoqiao Hydropower Station
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 10
Standardised Baselines N/A
Estimated annual reductions* 107,054
Start date of first crediting period. 01 Mar 10
Length of first crediting period. 7 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 13 Jan 10 - 11 Feb 10
PP(s) for which DOE have a contractual obligation South Pole Carbon Asset Management Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (832 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
It is confused that Capacity Optimization Report was made in December 2005. The date was later than the time of decision making in October 2005. In Capacity Optimization Report, "According to the country’s Western Development policies on hydropower station investment, the income tax is exempted for the first three years, and the income tax rate is 15% after three years."
Submitted by: CDM Hydro


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs