Zorlu Enerji Wind Project
[]
Host party(ies) Pakistan
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 90,636
Start date of first crediting period. 01 Jan 12
Length of first crediting period. 7 years
DOE/AE Bureau Veritas India Pvt. Ltd.
Period for comments 16 Nov 11 - 15 Dec 11
PP(s) for which DOE have a contractual obligation EcoSecurities International Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (3317 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
test
Submitted by: Qiao SHI

The IRR that is determined by the PP is unreasonably high and much higher than anything approved by the CDM EB before. The determination and applicability should be accessed thoroughly.
Submitted by: Harshpreet Grewal


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs