Waste heat utilization project for drying wet flyash with waste heat available in the clinker cooler at the cement plant at Yerraguntla, Zuari Cement Limited
[]
Host party(ies) India
Methodology(ies) AMS-III.Q. ver. 3
Standardised Baselines N/A
Estimated annual reductions* 46,795
Start date of first crediting period. 01 Jan 10
Length of first crediting period. 10 years
DOE/AE Bureau Veritas India Pvt. Ltd.
Period for comments 08 Jan 10 - 06 Feb 10
PP(s) for which DOE have a contractual obligation Zuari Cement Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1064 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs