Wastewater Treatment with Biogas System in Palm Oil Mill at Saikhueng, Surat Thani, Thailand
[]
Host party(ies) Thailand
Methodology(ies) AMS-III.H. ver. 14
AMS-I.D. ver. 15
Standardised Baselines N/A
Estimated annual reductions* 21,288
Start date of first crediting period. 01 Jul 10
Length of first crediting period. 10 years
DOE/AE SGS-UKL
Period for comments 10 Apr 10 - 09 May 10
PP(s) for which DOE have a contractual obligation Danish Ministry of Climate and Energy
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (687 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs