Biogas Project at Anson Oil Mill
[]
Host party(ies) Malaysia
Methodology(ies) AMS-III.H. ver. 16
Standardised Baselines N/A
Estimated annual reductions* 19,464
Start date of first crediting period. 01 Jul 12
Length of first crediting period. 10 years
DOE/AE SIRIM
Period for comments 04 Apr 12 - 03 May 12
PP(s) for which DOE have a contractual obligation Nordjysk Elhandel A/S
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (564 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
The PP has wrongly interpreted the paragraph 28 for Greenfield Activities, since para 28(1) applies for the case where the WWT system has been operating for more than 3 years, not para28(2). This requires that the Measurement Campaign be conducted at the WWT plant where the Greenfield Activity will occur, which is reasonable. Why would the PP take data from another site if the existing WWT plant was operating for more than 3 years? My take on para28(2) is that this is applicable only if the mill is new or has just started operation and the data from a Measurement Campaign would not be representative of normal operation.
Submitted by: gerald hamaliuk


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs