Greenhouse Gas Abatement from energy efficient power generation through Gas Engines (195 MW Project)
[]
Host party(ies) Bangladesh
Methodology(ies) ACM0013 ver. 5
Standardised Baselines N/A
Estimated annual reductions* 99,288
Start date of first crediting period. 01 Apr 15
Length of first crediting period. 10 years
DOE/AE EPIC Sustainability Services Pvt. Ltd.
Period for comments 10 Jan 15 - 08 Feb 15
PP(s) for which DOE have a contractual obligation United Ashuganj Energy Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (803 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs