Grid connected, combined cycle power project of capacity 374.57 MW at Gujarat, India
[]
Host party(ies) India
Methodology(ies) AM0029 ver. 3
Standardised Baselines N/A
Estimated annual reductions* 334,368
Start date of first crediting period. 01 Dec 09
Length of first crediting period. 10 years
DOE/AE Bureau Veritas India Pvt. Ltd.
Period for comments 29 Dec 09 - 27 Jan 10
PP(s) for which DOE have a contractual obligation Gujarat State Electricity Corporation Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (3717 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
1.	As mentioned in economic and social well being section, how many skilled/unskilled people from surrounding area will be employed at this project during construction/installation and operation? 
2.	As mentioned in social well being, greenbelt development and school operation are only due to CDM project activity? In absence of CDM project, project proponent was not going to create greenbelt or primary school or cooperative society or post office?
3.	In case of absence of CDM revenue and lignite based power plant, Project Proponent had to develop greenbelt. It is compulsory condition of Environmental Clearance and not part of CDM project.
4.	Is it assured that generated electricity will be feed into local power grid?
7.	Environment Public Hearing is integral part of Environment Clearance process in India. What was major concern raised during EPH of this project? Whether minutes of EPH have been available with DOE?
8.	Stake holder consultation did not include district or state government authority from environment department / pollution control board. 
9.	Please explain type of community work carried out from 2% of earned CDM revenue.

From
Hiral Mehta/Mahesh Pandya
Environmental Engineers
Paryavaran mitra
502, Raj Avenue, Bhaikakanagar road
Thaltej, Ahmedabad - 380059
Telefax - 079-26851321/1801
email - paryavaranmitra@yahoo.com
Submitted by: paryavaranmitra


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs