10.5 MW Wind Power Project in the state of Tamil Nadu by M/s Nidhi Mining Private Limited.
[]
Host party(ies) India
Methodology(ies) AMS-I.D. ver. 14
Standardised Baselines N/A
Estimated annual reductions* 24,299
Start date of first crediting period. 02 Apr 10
Length of first crediting period. 10 years
DOE/AE DNV-CUK
Period for comments 19 Aug 09 - 17 Sep 09
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (301 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Comment (36 KB) submitted by: Sonika on behalf of EcoSol

Is this project sustainable in the long run due the additonality arguments presented in the PDD VIZ the IRR is 6.59% and the require returns is 12.75% BPLR. But even with CDM benfits the IRR comes to 9.75%. considering the above case how will the PP find funds to run the project with these deficit funds.

2. Regulatory Barrier the tariff mentioned for varous provinces of india are mentioned. but the metering points for different provinces varies with province to province in that sense is the argument strong. will the DOE look into the all technical details involved in that to have a thorough assessment on it?
Submitted by: Indian 4 Sustainable Development


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs