El Popal 20 MW hydroelectric project
[]
Host party(ies) Colombia
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 48,402
Start date of first crediting period. 01 Jan 14
Length of first crediting period. 7 years
DOE/AE KBS Certification Services Limited (changed as of 20 Aug 2018)
Period for comments 22 Sep 11 - 21 Oct 11
PP(s) for which DOE have a contractual obligation Popal S.A.S. E.S.P.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1333 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs