Inner Mongolia Jilantai Carbide Calcium Residues Based Cement Plant Project
[]
Host party(ies) China
Methodology(ies) ACM0015 ver. 2
Standardised Baselines N/A
Estimated annual reductions* 235,634
Start date of first crediting period. 01 Jan 11
Length of first crediting period. 10 years
DOE/AE DNV-CUK
Period for comments 27 Mar 10 - 25 Apr 10
PP(s) for which DOE have a contractual obligation CNSG Jilantai Salt Chemical Group Co. Ltd. (indirectly contracted through PDD developer Coway International TechTrans Co., Ltd.)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (697 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs