Biogas recovery from wastewater treatment in PT. Umbul Mas Wisesa Palm Oil Mill
[]
Host party(ies) Indonesia
Methodology(ies) AMS-III.H. ver. 16
Standardised Baselines N/A
Estimated annual reductions* 51,399
Start date of first crediting period. 31 Aug 12
Length of first crediting period. 10 years
DOE/AE SIRIM
Period for comments 07 Dec 11 - 05 Jan 12
PP(s) for which DOE have a contractual obligation Knowledge Integration Services (Singapore) Pte Ltd
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (543 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs