Roxol Wastewater Treatment and Methane Gas Recovery Project
[]
Host party(ies) Philippines
Methodology(ies) ACM0014 ver. 3
Standardised Baselines N/A
Estimated annual reductions* 156,593
Start date of first crediting period. 31 Mar 10
Length of first crediting period. 7 years
DOE/AE DNV-CUK
Period for comments 17 Feb 10 - 18 Mar 10
PP(s) for which DOE have a contractual obligation The World Bank Group
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (627 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs