Inner Mongolia Damo Wujier Phase I Wind Power Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 101,364
Start date of first crediting period. 01 Mar 12
Length of first crediting period. 7 years
DOE/AE TUEV-RHEIN
Period for comments 28 Oct 11 - 26 Nov 11
PP(s) for which DOE have a contractual obligation Inner Mongolia Damo (Hangjinqi) Windpower Co., Ltd.
General Energy Capital Co., Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1375 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
The project started turbine purchase on 16/02/2011 (http://webcache.googleusercontent.com/search?q=cache:rHYigM7cSVwJ:www.geoho.cn/_d271360656.htm+&cd=1&hl=zh-CN&ct=clnk&client=firefox-a) and construction in April 2011 (http://ordos-xny.com/?m=20111028) before approval issued from local DRC on 10/10/2011. Such activity is illegal.
Submitted by: fengdian


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs