LFG power plant in Changwon
[]
Host party(ies) Republic of Korea
Methodology(ies) AMS-III.G. ver. 9
AMS-I.D. ver. 18
Standardised Baselines N/A
Estimated annual reductions* 34,293
Proposed start date of PA 01 Nov 19
Start date of first crediting period. 01 Nov 19
Length of first crediting period. 7 years
DOE/AE Korea Testing & Research Institute
Period for comments 23 Mar 19 - 21 Apr 19 (23:59:59 GMT)
PP(s) for which DOE have a contractual obligation LF energy Co., Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1327 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
The project activity is using the tool "Emission from solid waste disposal sites" (https://cdm.unfccc.int/methodologies/PAmethodologies/tools/am-tool-04-v8.0.pdf). 

In my research, published at Journal of Environmental Management (http://www.sciencedirect.com/science/article/pii/S0301479715302528), I have demonstrated that there is a correction needed in this tool. 

The project participants may be aware that their ex-ante calculations are not so accurate.
Submitted by: Mauro Meirelles de Oliveira Santos


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs