Huadian Sichuan Mulihe Kajiwa Hydropower Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 1,522,211
Start date of first crediting period. 01 Jul 14
Length of first crediting period. 7 years
DOE/AE Korean Foundation for Quality
Period for comments 30 Sep 11 - 29 Oct 11
PP(s) for which DOE have a contractual obligation Arreon Carbon Trading Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1038 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Turbines purchase contract of Lizhou poject and Kajiwa project were signed on December 6, 2010
 
http://hzgpg.com/en/main.asp

Many news reported that construction contract of Kajiwa project in 2009, such as http://www.capitalvue.com/home/CE-news/inset/@13548/post/1019158, if you need more evidence, I can send to you.
Gezhouba Won RMB 760M Dam Construction Contract  

Wednesday 2009-07-29  00:14
China Gezhouba Group (600068) won a RMB 760 million contract from Sichuan Huadian Mulihe Hydropower Development, reports Securities Times. The contract is for the construction of the dam for the Mulihe Kajiwa hydropower plant; construction period is 43 months. The hydropower plant is located in Muli County in Sichuan. According to Gezhouba, the contract will not have a material impact on its profits in 2009, but should contribute to profits in the coming years.

the validator should check those websites before send my comment to the pp
Submitted by: Fan Shuidian


The comment period is over.