Grid connected natural gas based power project in Raigad District, Maharastra, India
[]
Host party(ies) India
Methodology(ies) AM0029 ver. 3
Standardised Baselines N/A
Estimated annual reductions* 1,505,877
Start date of first crediting period. 09 Oct 12
Length of first crediting period. 10 years
DOE/AE SIRIM
Period for comments 16 May 12 - 14 Jun 12
PP(s) for which DOE have a contractual obligation Pioneer Gas Power Limited (PGPL)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1339 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs