Assisted Natural Regeneration of Degraded Lands in Albania
[]
Host party(ies) Albania
Methodology(ies) AR-AM0003 ver. 4
Standardised Baselines N/A
Estimated annual reductions* 22,753
Start date of first crediting period. 01 Mar 06
Length of first crediting period. 20 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 23 Oct 08 - 06 Dec 08
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1348 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs