Xia County Sijiao Town Phase I 49.5MW Wind Power Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 13
Standardised Baselines N/A
Estimated annual reductions* 84,629
Start date of first crediting period. 01 Aug 13
Length of first crediting period. 7 years
DOE/AE Re Carbon Gözetim Denetim ve Belgelendirme Limited Sirketi
Period for comments 13 Oct 12 - 11 Nov 12
PP(s) for which DOE have a contractual obligation Xia County Sijiao Town Phase I 49.5MW Wind Power Project
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (761 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs