Duanwang CMM Power Generation Project
[]
Host party(ies) China
Methodology(ies) ACM0008 ver. 6
Standardised Baselines N/A
Estimated annual reductions* 130,002
Start date of first crediting period. 01 Jan 11
Length of first crediting period. 7 years
DOE/AE ERM-CVS
Period for comments 07 Jul 10 - 05 Aug 10
PP(s) for which DOE have a contractual obligation Equity + Environmental Assets Ireland Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1678 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Comment (n/a) Submitted by: CMM Shanxi

Comment (n/a) Submitted by: CMM Shanxi

Comment (29 KB) Submitted by: CMM Shanxi


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs