Methane Capture and On-site Power Generation Project at Sungai Kerang Palm Oil Mill in Sitiawan, Perak, Malaysia
[]
Host party(ies) Malaysia
Methodology(ies) AM0022 ver. 4
Standardised Baselines N/A
Estimated annual reductions* 89,023
Start date of first crediting period. 01 Apr 08
Length of first crediting period. 10 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 20 Nov 07 - 19 Dec 07
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs