Xieshui River Stage III Hydropower Project of Shimen County, Hunan Province
[]
Host party(ies) China
Methodology(ies) AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 42,653
Start date of first crediting period. 01 Jun 12
Length of first crediting period. 7 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 09 Feb 12 - 09 Mar 12
PP(s) for which DOE have a contractual obligation Climate Protection Partners AG
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (919 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Information in PDD is not transparent.

1. 10% benchmark is an pre-tax indicator while it is used as post-tax in this project.
    Reference: page 51 in SL 16-2010 which also links the info on page 204 in Project Financial Assessment Methods and Indicators (3rd edition)

2. Project started almost 4 years ago. How to understand CDM is seriouly considered?

3. Xieshui River Stage III Hydropower Project is Shimen Suojie Small Hydropower Project, see http://webcache.googleusercontent.com/search?hl=zh-CN&gbv=2&gs_sm=3&gs_upl=3469l3469l0l4172l1l1l0l0l0l0l109l109l0.1l1l0&q=cache:THqPlts1MkQJ:http://suojie.hncdst.cn/webfenye.asp?dl=%CD%B6%D7%CA%D6%B8%C4%CF&xl=%D5%D0%C9%CC%CF%EE%C4%BF+%E5%90%8C%E6%84%8F%E5%B0%86%E9%BB%84%E8%99%8E%E6%B8%AF%E8%87%B3%E6%89%80%E8%A1%97%E6%B2%B3%E6%AE%B5%E7%9A%84%E6%89%80%E8%A1%97&ct=clnk, which was registered as a CDM project in 2008 (http://cdm.unfccc.int/Projects/DB/DNV-CUK1207306891.52/view).
Submitted by: shuidian


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs