Gonal Small Hydro Project by South West Hydro
[]
Host party(ies) India
Methodology(ies) AMS-I.D. ver. 16
Standardised Baselines N/A
Estimated annual reductions* 13,840
Start date of first crediting period. 01 Jan 12
Length of first crediting period. 10 years
DOE/AE TUEV-RHEIN
Period for comments 09 Apr 11 - 08 May 11
PP(s) for which DOE have a contractual obligation South West Hydro Power Private Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (401 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Validator validate whether IRR calculation considers subsidy consideration as a cash inflow in the initial years of project operation.
Submitted by: Arnab deb

•	PLF should be based on EB48 Annex 11guideline which says The plant load factor provided to banks and/or equity financiers while applying the project activity for project financing, or to the government while applying the project activity for implementation approval; (b) The plant load factor determined by a third party contracted by the project participants (e.g. an engineering company); But PDD doesn’t demonstrate how PLF has been arrived at.
•	PDD does not clearly describe the stakeholders involved in Project or the information provided to them. The PDD mentions stakeholders have been invited,” but no details which of these stakeholders actually participated in the process. The PDD does not describe the information provided to stakeholders with sufficient clarity, such as whether adverse environmental impacts were described along with the benefits that were mentioned.
•	The PDD does not explain about identified training, monitoring and maintenance as per the Technology requirements for contractors / engineers by the client. There is no mention of field quality Assurance systems & procedures that are available at site, field quality plans and their approval.
•	Time schedule of key events does not speak about the status of project activity and why DOE has taken so long days to just web host the PDD. What is the reason for the delay? This kind of delays shows how serious PP in getting CDM benefits.
•	Also the chronology of events do not mention any offer letter?.. Then how DoE has made due diligence that the project confirms to UNFCCC guidelines?. 
•	There are neither links nor documents mentioned for proof of the parameters assumed for the IRR? 
•	How is PLF estimated to be in accordance to UNFCCC guidelines? 
•	Also the tariff rate has been assumed based on rate existing at investment decision. But does it account for the escalation and why it has been assumed at a flat rate?
•	When is the board meeting and date of investment decision? It is not explicitly mentioned in the PDD.  
•	Why barrier analysis is not discussed in the PDD. If there is no barrier, then it should be mentioned in the PDD. 
•	Interest rate tax has been taken from FSR. Relevant guidance to be applied
Submitted by: A.Flower


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs