Dong Nai 2 Hydropower Project
[]
Host party(ies) Viet Nam
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 138,134
Start date of first crediting period. 01 Sep 12
Length of first crediting period. 7 years
DOE/AE ERM-CVS
Period for comments 01 Oct 11 - 30 Oct 11
PP(s) for which DOE have a contractual obligation Deutsche Bank AG, London Branch
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (562 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs