Dukouba 129MW Hydropower Project in Chongqing City
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 11
Standardised Baselines N/A
Estimated annual reductions* 363,425
Start date of first crediting period. 01 Sep 11
Length of first crediting period. 7 years
DOE/AE TECO
Period for comments 23 Jun 10 - 22 Jul 10
PP(s) for which DOE have a contractual obligation ECO Asset Incorporated
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (476 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs