Combined Heat and Power generation at Gujarat Eco-Textile Park Ltd, Gujarat- India
[]
Host party(ies) India
Methodology(ies) AMS-II.H.
Standardised Baselines N/A
Estimated annual reductions* 33,756
Start date of first crediting period. 01 Jun 09
Length of first crediting period. 10 years
DOE/AE TÜV NORD CERT GmbH
Period for comments 18 Mar 09 - 16 Apr 09
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (568 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
It is very clear from the chronology of events mentioned in the PDD that CDM consideration was an after thought. The fact that from board resolution to the first email from the possible CDM consultant is about 12 Months gap proves this Point. Hence DOE and validating agency need to check and verify that CDM consideration is real and pre established.
Submitted by: A.R.Ravi Kumar

1.	As mentioned in social well being section, how many skilled/unskilled people from surrounding area will be employed at this project during construction/installation and operation? 
2.	Environment Public Hearing is integral part of Environment Clearance process in India. What was major concern raised during EPH of this project? Whether minutes of EPH has been available with DOE? What are the major conditions stipulated in Environment Clearance?
3.	Whether uninterrupted supply of Natural Gas has been ensured from suppliers for continuous operation? Whether gas will be provided from existing network of pipeline or modification is needed?
4.	In the stakeholder meeting it is mentioned that local representative and people from vicinity are invited but list does not show names or comments from them. 
5.	Stake holder consultation did not include district or state government authority from environment department / pollution control board. 
6.	Whether local villagers would be beneficiary of CDM revenue earned by company? Any plan has been develop to earmark certain fund from CDM revenue for community welfare to improve social well being of local people?
From
Hiral Mehta/Mahesh Pandya
Environmental Engineers
Paryavaran mitra
502, Raj Avenue, Bhaikakanagar road
Thaltej, Ahmedabad - 380059
Telefax - 079-26851321/1801
email - paryavaranmitra@yahoo.com


Submitted by: paryavaranmitra

The DOE is requested to investigate how the CDM benefits assist the project participant in the overcoming the barriers mentioned under section B.5 in the PDD, in particular:

- any statistics on use of gas engines in Indian industries located in the Gujarat region

- availability of spare parts and why Rolls-Royce engine is more complicated than any supplier of similar engines; how does non-availability of skill justified; there would be several gas engines based as well as Rolls Royce based projects in India

- impact of non-availability of gas; if this happens than the project proponent will purchase electricity and burn fossil fuels; the monitoring plan should account for leakage emissions in that case for periods of such occurences.

It is not clear how the economic value of 33,756 CERs per year could overcome barriers posed by non-availability of natural gas.
Submitted by: Rahul Kar


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs