Salto Cafesoca Small Hydropower Project
[]
Host party(ies) Brazil
Methodology(ies) AMS-I.F.
Standardised Baselines N/A
Estimated annual reductions* 47,829
Start date of first crediting period. 01 Jan 13
Length of first crediting period. 7 years
DOE/AE TÜV NORD CERT GmbH
Period for comments 11 Jan 11 - 09 Feb 11
PP(s) for which DOE have a contractual obligation Sociedade Amapaense de Produção de Energia Elétrica Ltda - SAPEEL
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (608 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs