Zhurihe Phase I 49.5MW Wind Farm Project in Xilingol League, Inner Mongolia Autonomous
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 11
Standardised Baselines N/A
Estimated annual reductions* 113,310
Start date of first crediting period. 01 Nov 10
Length of first crediting period. 7 years
DOE/AE Germanischer
Period for comments 24 Mar 10 - 22 Apr 10
PP(s) for which DOE have a contractual obligation Climate Bridge Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (987 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
In FSR approval, net power supply was 139,050MWh annually, 17% more than the figure in PDD.

No contact information of the third PP.
Submitted by: fengdian


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs