Energy efficient power generation in Raigarh, Chhattisgarh, India
[]
Host party(ies) India
Methodology(ies) ACM0013 ver. 4
Standardised Baselines N/A
Estimated annual reductions* 477,900
Start date of first crediting period. 01 Jun 15
Length of first crediting period. 10 years
DOE/AE SGS-UKL
Period for comments 19 Aug 11 - 17 Sep 11
PP(s) for which DOE have a contractual obligation Visa Power Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (902 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Only one alternative has been considered, viz., sub critical. All other alternatives have been eliminated without even financial analysis. As per the Methodology alternatives can be excluded only if they are not in compliant with all applicable legal and regulatory requirements. The CDM-PDD should submit for validation a clear comparison of the financial indicator for all scenario alternatives, which are compliant with applicable legal and regulatory requirements, Therefore dismissal of alternatives citing reasons such as non-inconsistent availability, high risk and expectation of non availability is not conforming to methodological requirements though it helps the consultant from providing calculation. The presentation does not satisfy ACM 0013. Therefore, restricting the alternatives to sub critical (probably pit head plant as nowhere it is stated whether it is pit head, linkage or imported coal based plant) is not correct.

Levelised cost is used to demonstrate additionality. Is LECP is considered appropriate financial indicator for the project type and decision making context? This does not satisfy additionality tool or the methodology. 

There is no mention anywhere to whom the power is to be sold and whether PPA has been signed or not. However, the company reports that it has signed MOU with Chhatisgarh Govt in 2007. Company’s website states that it is setting up not 660 MW project, but 1200 MW power plant at a cost of Rs.6200 core, yielding a cost of 5.17 crore.  As against this the project cost given in web hosted PDD is 6.7 core. If the PP states that the cost given in their website is for sub critical and not super critical project, then the cost assumed for sub critical project at Rs.3.35 core/MW is totally incorrect. In either way the figures given in web hosted PDD are not reliable. Moreover, setting up sub critical project at Rs.3.35/MW in 2013-14 is undependable, because the Expert Committee projected a cost of Rs.4 core/MW as early as February 2004. 

Publications, which are available in web indicate the difference in the capital cost between sub critical and super critical projects is not more than 15%. In this case, the difference is 30% more.  Moreover, Expert Committee on Fuels has given a cost of Rs.4 core per MW in 2004. How is it possible for the company to set up the sub critical project at Rs.4 crore per MW 7 years after the publication of the report?

The PDD does not give any information on the conformity of project to Annex 22, EB 49.  

This is not a bid based project. Company’s website states that the power shall be supplied to Chhattisgarh State Power Distribution Company Limited, Tata Power Trading Corporation Limited and balance to distribution licensees and industrial consumers in Maharashtra. The tariff in respect of supply to Chhattisgarh State Power Distribution company will be decided by CERC after taking into consideration the fixed and variable cost and the Return on equity;  Tata Power trading and industrieal consumers in Maharashtra will pay much higher tariff. Why should the company require CDM benefits? 


Submitted by: Karthikeyan

Comment (614 KB) submitted by: Sergey Firsov on behalf of Steve Herz, Sierra Club


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs