Royal Swaziland Sugar Corporation Fuel Switch and Cogeneration Projects
[]
Host party(ies) Eswatini
Methodology(ies) ACM0006 ver. 13
Standardised Baselines N/A
Estimated annual reductions* 120,751
Proposed start date of PA 15 Jun 10
Start date of first crediting period. 01 Dec 17
Length of first crediting period. 10 years
DOE/AE Carbon Check (India) Private Ltd.
Period for comments 05 Aug 17 - 03 Sep 17 (23:59:59 GMT)
PP(s) for which DOE have a contractual obligation Royal Swaziland Sugar Corporation Limited (RSSC)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (4366 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs