Catalytic N2O abatement project in the tail gas of the nitric acid production plant in G.F.C,Syria
[]
Host party(ies) Syrian Arab Republic
Methodology(ies) AM0028 ver. 5
Standardised Baselines N/A
Estimated annual reductions* 198,963
Start date of first crediting period. 01 Jul 11
Length of first crediting period. 7 years
DOE/AE Japan Quality Assurance Organisation
Period for comments 13 May 10 - 11 Jun 10
PP(s) for which DOE have a contractual obligation Shimizu Corporation
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1074 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs