Increase of Power Generation of the hydroelectric power station Fortuna in Panama (IPGFP)
[]
Host party(ies) Panama
Methodology(ies) ACM0002 ver. 6
Standardised Baselines N/A
Estimated annual reductions* 13,709
Start date of first crediting period. 01 Jan 07
Length of first crediting period. 7 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 20 Sep 06 - 19 Oct 06
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs

The content you see inside this frame is located outside the UNFCCC CDM Website. If you have problems viewing the content in the frame, click here to access the web site directly.
   
UNFCCC Secretariat assumes no responsibility for the third-party content linked through its website