Grid connected wind power project in India by SRB Consultancy Pvt. Ltd
[]
Host party(ies) India
Methodology(ies) AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 8,561
Start date of first crediting period. 31 Dec 11
Length of first crediting period. 10 years
DOE/AE RINA Services S.p.A.
Period for comments 04 Aug 11 - 02 Sep 11
PP(s) for which DOE have a contractual obligation SRB Consultancy Pvt. Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (428 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
This PDD does not give any information on the input parameters and assumptions used other than installed capacity, debt equity ratio, and tariff which are available from public domain. This is not conforming to CDM requirement where the reader should be in a position to construct the worksheet and arrive at the same results. Since no information is given, this requirement is not fulfilled. This project is non-additional and PP and consultant are making it additional. Therefore the information are hidden so that global stakeholders cannot comment on them. Hiding information only proves that the project is not additional and has been made additional. Otherwise there is no reason why the PP should hide information from global stakeholders. Therefore, this project should not be taken up for validation by DOE unless the PP re webhosts the PDD with all information. If the DOE goes ahead with validation without re webhosting, it will prove that it is also not aware of the rules. EB may kindly ensure that this project is not accepted for registration unless it is re web hosted with all information
Submitted by: Karthikeyan


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs