“Ensenada Hydroelectric Project”
[]
Host party(ies) Chile
Methodology(ies) AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 18,794
Start date of first crediting period. 01 Jul 12
Length of first crediting period. 7 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 21 Dec 11 - 19 Jan 12
PP(s) for which DOE have a contractual obligation Hidroeléctrica Ensenada S.A.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1384 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
The project adopts equity IRR benchmark to test project IRR and it is absolutely wrong to include depreciation in cash flow. So the project IRR is very high after correction. Lambda determination is doubtful. It seems power duration curve is used than load duration curve.
Submitted by: Floria


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs