52.50 MW Wind energy farm at Mokla Rajasthan by HZL
[]
Host party(ies) India
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 85,250
Start date of first crediting period. 01 Mar 12
Length of first crediting period. 7 years
DOE/AE DNV-CUK
Period for comments 14 Oct 11 - 12 Nov 11
PP(s) for which DOE have a contractual obligation Hindustan Zinc Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (646 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
How the 36% of equity contribute to 100% of project cost. Is Only 36% of project cost is contributed by equity?
Submitted by: dwarakaa


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs