Jilin Taonan Xinli 49.5MW Wind Power Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 101,214
Start date of first crediting period. 01 Jul 11
Length of first crediting period. 7 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 22 Jan 11 - 20 Feb 11
PP(s) for which DOE have a contractual obligation Jilin Tong Li Wind Farm Power Co., Ltd
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (680 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
There is a similar wind project located nearby which started almost 6 years ago with lower unit investment cost (UNFCCC Ref. 0599). Wind turbine purchase expense constitutes the main part of investment cost. And the equipment is cheaper in years because of market maturity. So it is diffcult to believe higher investment cost.
Submitted by: fengdian


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs