AIN08-W-03, Methane Recovery in Wastewater Treatment, Sumatera Utara, Indonesia
[]
Host party(ies) Indonesia
Methodology(ies) AMS-III.H. ver. 9
Standardised Baselines N/A
Estimated annual reductions* 22,290
Start date of first crediting period. 01 May 09
Length of first crediting period. 7 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 13 Jun 08 - 12 Jul 08
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs

The content you see inside this frame is located outside the UNFCCC CDM Website. If you have problems viewing the content in the frame, click here to access the web site directly.
   
UNFCCC Secretariat assumes no responsibility for the third-party content linked through its website