API WHR Project
[]
Host party(ies) India
Methodology(ies) ACM0012 ver. 3
Standardised Baselines N/A
Estimated annual reductions* 29,904
Start date of first crediting period. 01 Oct 09
Length of first crediting period. 10 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 06 Aug 09 - 04 Sep 09
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (638 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
- Its really difficult to understand the logic made by the consultant in order to compare 8MW WHRB with 13 MW Coal fired boiler! 

- Story regarding "CDM consideration" is good, however, its still a story and the suggested 3rd party evidences (letter from other companies) can easily be obtained. There should be some other evidence other than these. 

- Financial barrier, i.e., the robustness of different parameters used in the calculation like PLF, days of operation, etc should be confirmed as per latest EB guidelines and not from as observed in past registered PDD.
Submitted by: Sonika

1.	Page no 16 of   PDD   sub step 2 c – How can project proponent compare an 8 MW WHRB and 7 MW AFBC power plant with a 13 MW coal based power  plant  for the economic comparison 
2.	Page 17  of  PDD  table AFBC based Power plant serial no. 18  & 19 are the  waste  i.e. unburnt coal fines as mentioned on the  page  1 of PPD paragraph 2  line 8, why  the cost of  the same has been  included 
3.	Section B.7.1 – hasn’t mention the apportioning formula as both power  plants  have common  steam  header 
4.	Page 16 & 17 of PDD  PLF of WHRB plant has  been assumed 85 % while  the project is a  proposed one
5.	Page 21 & 22 chronology  of serious CDM consideration  -  there is no serious  CDM consideration DOE should take clarification from the project proponent 
Submitted by: Pragya Kaushik

1.	Page no 16 of   PDD   sub step 2 c – How can project proponent compare an 8 MW WHRB and 7 MW AFBC power plant with a 13 MW coal based power  plant  for the economic comparison 
2.	Page 17  of  PDD  table AFBC based Power plant serial no. 18  & 19 are the  waste  i.e. unburnt coal fines as mentioned on the  page  1 of PPD paragraph 2  line 8, why  the cost of  the same has been  included 
3.	Section B.7.1 – hasn’t mention the apportioning formula as both power  plants  have common  steam  header 
4.	Page 16 & 17 of PDD  PLF of WHRB plant has  been assumed 85 % while  the project is a  proposed one
5.	Page 21 & 22 chronology  of serious CDM consideration  -  there is no serious  CDM consideration DOE should take clarification from the project proponent 
Submitted by: Pragya Kaushik


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs