Hebei Zunhua Straw Power Generation Project
[]
Host party(ies) China
Methodology(ies) ACM0018
Standardised Baselines N/A
Estimated annual reductions* 134,823
Start date of first crediting period. 01 Jul 12
Length of first crediting period. 7 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 17 Sep 11 - 16 Oct 11
PP(s) for which DOE have a contractual obligation Climate Bridge Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (917 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
1. Project started construction on Dec. 25, 2009, can be verified at http://www.zhdsw.org/2009/1229/1802.html.

2. Straw utilization in local area is not completely documented in PDD against http://nyt.zj.gov.cn/html/ncny/informationView/120270.html.

3. Policies on preferential tax rate and financial subsidy are not considered (http://www.114nengyuan.cn/View.aspx?id=542#), which may increase 17% in cash inflow and therefore to lead the project financial attractive without CDM revenue. 
Submitted by: Floria


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs