1147.5 MW Natural gas based grid connected Combined cycle power generation project of M/s Torrent Power Limited at Akhakhol, Gujarat by M/s Torrent Power Limited.
[]
Host party(ies) India
Methodology(ies) AM0029
Standardised Baselines N/A
Estimated annual reductions* 3,172,717
Start date of first crediting period. 01 Jan 08
Length of first crediting period. 10 years
DOE/AE TÜV NORD CERT GmbH
Period for comments 13 Dec 06 - 11 Jan 07
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs

The content you see inside this frame is located outside the UNFCCC CDM Website. If you have problems viewing the content in the frame, click here to access the web site directly.
   
UNFCCC Secretariat assumes no responsibility for the third-party content linked through its website