Agro-forestry Interventions in Koraput district of Orissa
[]
Host party(ies) India
Methodology(ies) AR-AMS0004 ver. 2
Standardised Baselines N/A
Estimated annual reductions* 7,329
Start date of first crediting period. 28 Jul 09
Length of first crediting period. 30 years
DOE/AE TÜV NORD CERT GmbH
Period for comments 27 Feb 12 - 27 Mar 12
PP(s) for which DOE have a contractual obligation Patneswari Agri. Cooperative Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (648 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
i) The BEF value assumed for the project is in-correct. Thus the entire net removal calculation itself requires to be reviewed.  

ii) Lack of access to credit facilities has been shown as a barrier to project implementation. But it is not clear how it is applicable for the project as NABARD is providing credit. 

iii) It has been mentioned that NABARD has considered CDM as a requirement for providing loan to the project. But it is not clear how NABARD will benefit from the CDM project activity.
Submitted by: nitu maity


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs