Hangzhou Huadian Xiasha Natural Gas-fired Cogeneration Project
[]
Host party(ies) China
Methodology(ies) AM0107 ver. 2
Standardised Baselines N/A
Estimated annual reductions* 121,885
Start date of first crediting period. 01 Jun 13
Length of first crediting period. 7 years
DOE/AE Bureau Veritas India Pvt. Ltd.
Period for comments 01 Nov 12 - 30 Nov 12
PP(s) for which DOE have a contractual obligation Hangzhou Huadian Xiasha Co-heat and Power Generation Co., Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (2153 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs