China Yongzhou Xiangqi Hydropower Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 225,775
Start date of first crediting period. 01 Jul 12
Length of first crediting period. 7 years
DOE/AE TUEV-RHEIN
Period for comments 10 Nov 11 - 09 Dec 11
PP(s) for which DOE have a contractual obligation Huaneng Hunan Xiangqi Hydropower Co., Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1317 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
The project started construction on Oct. 27, 2009 (http://www.hpi.com.cn/Pages/Subsidiarydetail.aspx?SubID=1de7ebfa-14f4-4ea7-8c84-4942a302c2c9) - 11 months prior to notification. And this is a multipurpose project (http://www.hygsb.com/gzbsc/xyqy/6d4f28c9-390a-4638-b973-aa4b2e3938d4.shtml) with government involvement, CDM cannot be the key factor for investment decision.
Submitted by: shuidian


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs