Xinjiang Hami Yandun I Wind Farm Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 13
Standardised Baselines N/A
Estimated annual reductions* 386,734
Start date of first crediting period. 15 Dec 12
Length of first crediting period. 7 years
DOE/AE Re Carbon Gözetim Denetim ve Belgelendirme Limited Sirketi
Period for comments 29 Sep 12 - 28 Oct 12
PP(s) for which DOE have a contractual obligation China Power Investment Corporation Xinjiang Energy Co., Ltd. (project owner)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (688 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs