Liangshan Prefecture Yanyuan County Yongninghe Fourth Stage Hydropower Station Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 124,717
Start date of first crediting period. 01 Sep 12
Length of first crediting period. 7 years
DOE/AE TUEV-RHEIN
Period for comments 13 Jan 12 - 11 Feb 12
PP(s) for which DOE have a contractual obligation Arcadia Energy (Suisse) S.A.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (588 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Information in PDD is not transparent.

1. 10% benchmark is an pre-tax indicator while it is used as post-tax in this project.
    Reference: page 51 in SL 16-2010 which also links the info on page 204 in Project Financial Assessment Methods and Indicators (3rd edition)

2. VAT rate for hydro stations with installed capacity below 50 MW is only 6%, regulation from State Administration of Taxation

3. The project was under construction long time ago before the date of shareholder meeting in PDD. From http://finance.sina.com.cn/stock/s/20070527/16193633415.shtml, it shows 10% construction work was done till the end of 2005. Another article in 2008 from People's Daily Online give the information of project construction too (http://finance.people.com.cn/GB/8150010.html). EIA report in 2009 listed details on completed construction parts.
Submitted by: shuidian


The comment period is over.