Luanjingtan Eco-immigrant Demonstration Area 10MW Grid-connected Solar Power Generation Project in Alashan of Inner Mongolia
[]
Host party(ies) China
Methodology(ies) AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 15,270
Start date of first crediting period. 01 Aug 12
Length of first crediting period. 7 years
DOE/AE TUEV-RHEIN
Period for comments 29 Apr 12 - 28 May 12
PP(s) for which DOE have a contractual obligation CECEP Alashan League Solar Power Generation Co., Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1321 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs