Toabré Wind Farm
[]
Host party(ies) Panama
Methodology(ies) ACM0002 ver. 13
Standardised Baselines N/A
Estimated annual reductions* 369,799
Start date of first crediting period. 01 Jul 14
Length of first crediting period. 7 years
DOE/AE AENOR Confía, S.A.U.
Period for comments 20 Jun 12 - 19 Jul 12
PP(s) for which DOE have a contractual obligation Fersa Panamá S.A.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (739 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Comment (33 KB) submitted by: Rosabel Miro on behalf of Rosabel Miro

Comment (157 KB) submitted by: Asociacion Ambientalista de Chiriqui on behalf of RED DE AFECTADOS POR REPRESAS HIDROELECTRICAS Y MINAS Y EN DEFENSA DE LOS RIOS DE PANAMÁ & ASAMCHI

Comment (172 KB) submitted by: Asociacion Ambientalista de Chiriqui on behalf of RED DE AFECTADOS POR REPRESAS HIDROELECTRICAS Y MINAS Y EN DEFENSA DE LOS RIOS DE PANAMÁ & ASAMCHI

Comment (695 KB) submitted by: Asociacion Ambientalista de Chiriqui on behalf of RED DE AFECTADOS POR REPRESAS HIDROELECTRICAS Y MINAS Y EN DEFENSA DE LOS RIOS DE PANAMÁ & ASAMCHI

Comment (689 KB) submitted by: Asociacion Ambientalista de Chiriqui on behalf of RED DE AFECTADOS POR REPRESAS HIDROELECTRICAS Y MINAS Y EN DEFENSA DE LOS RIOS DE PANAMÁ & ASAMCHI

Comment (313 KB) submitted by: Asociacion Ambientalista de Chiriqui on behalf of RED DE AFECTADOS POR REPRESAS HIDROELECTRICAS Y MINAS Y EN DEFENSA DE LOS RIOS DE PANAMÁ & ASAMCHI


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs