Grid connected solar PV power plant in Kutchh district of Gujarat
[]
Host party(ies) India
Methodology(ies) AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 7,763
Start date of first crediting period. 01 Apr 12
Length of first crediting period. 7 years
DOE/AE Bureau Veritas India Pvt. Ltd.
Period for comments 10 Mar 12 - 08 Apr 12
PP(s) for which DOE have a contractual obligation Unity Power Private Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (411 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
•	Why this location has been chosen for this project?
•	Will this project have impact on temperature in surrounding area?
•	What would be impact of negative environmental conditions of area upon project? What would be alternatives in that case?
•	How many skilled/unskilled people from surrounding area will be employed at this project during commissioning and operation? 

From
Mahesh Pandya
Environmental Engineer
Paryavaran mitra
502, Raj Avenue, Bhaikakanagar road
Thaltej, Ahmedabad – 380059 India
Telefax - 079-26851321/1801
Submitted by: paryavaranmitra


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs